Pre-Commission Cleaning

Pre-Commission Cleaning of Pipework Systems

The pre-commission cleaning of closed loop systems has become more important over recent years; due to the equipment used being more susceptible to blockages at strainers, control valves and small bore pipework.

System contaminants such as millscale, jointing compounds and fabricating debris need to be removed by chemical cleaning and high velocity flushing, which will then allow the on-going water treatment regime to work effectively in preventing corrosion and microbiological fouling.

Existing systems that have accumulated deposits due to lack of the correct water treatment can be cleaned with a similar method. Flushing pipework with water alone is not always sufficient to remove contaminants which adhere to the surfaces of the pipes.

At HBE, we follow the recommendations of BSRIA AG 1/2001.1 and BG 29/11, which consists in general of the following steps:

  • Inspection of the system and identifying ideal flushing points, if these have not already been allowed for by the designer or mechanical contractor.
  • Identifying whether the mechanical contractor is to carry out the static water flush prior to chemical cleaning.
  • Flushing the system with water at high velocity to achieve the flushing velocities recommended by BSRIA or system design.
  • Undertake chemical cleaning of the system water to remove corrosion deposits and to mobilise any suspended solids present.
  • Bio-wash may be required prior to system cleaning.
  • Testing the water for the presence of biological fouling, iron, chlorides, conductivity Ph, copper and aluminium etc as well as testing the water for TVC, Pseudomonads and Sulfate-reducing bacteria.
  • Analysis of samples at UKAS accredited Laboratories.
  • Addition of glycol and a corrosion inhibitor for long term protection.
  • Installation of a side stream and hydro-cyclone filtration to remove suspended solids.
  • Regular monitoring visits to chemically test the water and maintain the correct inhibitor level and to ensure that bacterial levels are within acceptable limits.

We provide a wide range of test and balance services for both air and water systems, so please email enquiries@hberm.com for more information or call us on 0845 6399 673 or +353 (0) 1 257 3141  from Ireland.

Recent News

  • Legionella bacteria hbe

£1 million fine imposed on Hot Tub store after 2012 Legionnaires’ disease outbreak

July 10th, 2017|Comments Off on £1 million fine imposed on Hot Tub store after 2012 Legionnaires’ disease outbreak

A Discount Warehouse store has been fined £1m for their failings in 2012, where a Legionnaires' disease outbreak was caused by a display hot tub in the store, where 21 people were infected with Legionella bacteria, two of whom died.

  • HSG282 Legionella control in Spa Pools Jan2017

Spa Pool Technical Guidance HSG282 released

February 13th, 2017|Comments Off on Spa Pool Technical Guidance HSG282 released

HSE's technical guidance HSG282: The control of legionella and other infectious agents in Spa-Pool systems has been released.

  • Legionella bacteria hbe

Care Home chain resident dies of Legionnaires’ Disease

October 4th, 2016|Comments Off on Care Home chain resident dies of Legionnaires’ Disease

An inquest has heard that both process & training requirements were ignored at the Essex care home of a well known chain before the death of a resident from Legionnaires' disease.

  • Legionella bacteria hbe

Company fined £1.8m for Legionella management failings

September 7th, 2016|Comments Off on Company fined £1.8m for Legionella management failings

A large UK Company has been fined £1.8m after Harlow Council prosecuted the company for failing to manage Legionella risks on its sites.

  • HTM04-01 Water Hygiene Services HBE

How does the new HTM04-01 healthcare guidance affect you?

June 8th, 2016|Comments Off on How does the new HTM04-01 healthcare guidance affect you?

In May 2016 the Department of Health released new Guidance for Safe Water in Healthcare documentation, Health Technical Memorandum HTM04-01.